For EPC Contractors

We deliver the foundation.
You deliver the park.

Site-specific design, manufactured piles, skilled installation — or just the parts you need. Delivered on your schedule, under one accountable contract.

Request a project review
Engineered for challenging ground

Deliver a foundation that stays put.

Treat the foundation as a secondary line item on challenging ground and it comes back — racks tilt, modules break. The EPC carrying the warranty is the one retrofitting at margin-eating cost. A foundation that looked “good enough at handover” becomes a callback once the ground moves.

Helicasol piles are engineered for exactly this ground. The helix plate sits below the weak surface layer, anchored in stable load-bearing soil that stays put season after season. Length, diameter and helix size are sized site-by-site, zone-by-zone, for the soil that’s actually there.

Engineered specification. EN 1090 manufacturing. GPS-verified installation. Your scope ends when delivered — and stays delivered.

The three execution risks

Foundation is where solar projects lose weeks — if you let it.

It’s typically 10–15% of CAPEX, but it carries a disproportionate share of schedule and execution risk. When foundation slips, the whole park slips with it — and the delay goes on your file. Three risks sit on every tender.

01 · Design fit

Will it actually work here?

Standard driven-post designs often fall short on challenging sites — soft clay, peat, perched water, frost-affected fill. You end up with overdesign (eating your margin) or underdesign (triggering rework). Neither is acceptable when you’re on the hook for on-time delivery.

02 · Delivery velocity

Will the piles arrive on time?

Foundation is typically on your critical path. A manufacturer who can’t hit your volume, or an installer who slows in challenging soil, drags the whole project. And in solar, schedule slip compounds — racking waits, electrical waits, commissioning waits.

03 · Interface risk

Who’s accountable when something breaks?

Three subcontractors — designer, manufacturer, installer — means three coordination points and three places to finger-point when an issue arises. The liability still sticks to your EPC contract. One call, one supplier is a better way.

We take all three — or any combination you need — off your plate.

What you get

Foundations engineered, built, and installed — or any part you need.

01

Design sized to your site

Not generic. Data-driven sizing based on test piling and site-specific geotechnical analysis. No overdesign, no nasty surprises.

02

EN 1090 helical pile manufacturing

3,500+ helical piles per week, manufactured in-house. Low-carbon Nordic steel, full traceability from mill certificate to installation.

03

On-schedule installation

GPS-guided crews, up to 7 machines on site simultaneously. Demonstrated on 71,000-pile deliveries in peat.

04

Hybrid-site flexibility

Helical piles for the bulk of the site — manufactured in-house. For zones that demand them, we also install C-profile or rock-drilling solutions. One supplier across the foundation, no interface gaps.

05

Installation flexibility

Our crews install with GPS-guided rigs and torque verification on every pile, or we supply piles with installation criteria, training and ongoing support to your civil works contractor — keeping all groundworks under one trusted sub.

06

One contract, one call

Single accountable partner for the foundation scope. No finger-pointing, no coordination overhead between three sub-suppliers.

How we work

From tender to last pile — on your schedule.

  1. 1

    Tender review

    Days · Free

    Send us your site data, layout, and schedule. We respond with preliminary sizing, confirmed capacity in your soil type, and an indicative cost range you can carry into your bid.

  2. 2

    Test piling on challenging sites

    Optional · 2 days – 1 week

    When the ground is uncertain, we run pull-out tests (PoT), compression, and lateral tests before you commit to a fixed bid. Your firm price rests on verified capacity, not assumptions.

  3. 3

    Final design & offer

    Site-specific, optimized

    Site-specific pile sizing, installation criteria, and zone-by-zone recommendations. Delivered to Eurocode 7, EN 61773, and industry standards.

  4. 4

    Manufacture & deliver

    EN 1090 helical piles · 3,500+/week

    Nordic low-carbon steel, full material traceability. Production matched to your install schedule. Documentation delivered alongside every batch.

  5. 5

    Install — by us, or by your civil works contractor

    Engineered specification & installation support

    We install with our own crews and equipment — every pile’s position (GPS) and capacity (torque) lands in your delivery report. Or, we supply piles to your civil works contractor with installation criteria, training and ongoing support — keeping your groundworks under one trusted sub.

Your park commissions on schedule. Foundation becomes the line item investors ask fewest questions about.

Delivered at scale

Selected solar references.

Hallanvahti Solar Park, Finland 71,000 PILES · 7 MACHINES · 10 MONTHS
Finland · 2025–2026
Hallanvahti Solar Park

Joroinen · 129 MW / 200 ha

Finland’s 2nd largest solar park. Full delivery scope: design, manufacture, install. Up to 7 piling units on site simultaneously, ~30 installers on two shifts — 71,000 piles delivered on schedule across 200+ hectares of peat.

Cleve Hill electrical compound, Kent UK 1,000+ PILES · 373 MW GRID
United Kingdom · 2023
Cleve Hill electrical compound

Kent, England · 373 MW grid connection

Connecting UK’s largest operational solar park to the national grid. Helical piles for switchroom, transformers, and floodgate — delivered on time through soft clay, protected bird species, and unexploded WW2 ordnance constraints.

Cleve Hill BESS, Kent UK 1,200+ PILES · 150 MW / 300 MWh
United Kingdom · 2025
Cleve Hill BESS

Kent, England · 150 MW / 300 MWh BESS

One of the UK’s largest battery-storage facilities. 1,200+ helical piles supporting 250 heavy 20-foot containers, installed in a few weeks to hold a tight commissioning schedule.

Ypäjä Solar Power Plant 2P TRACKER STRUCTURES
Finland · 2023
Ypäjä Solar Power Plant

Ypäjä · 1.5 MWp 2P trackers

Complete foundation scope for 1.5 MWp of 2P tracker structures. Demonstrated helical performance under tracker-specific loads in demanding winter conditions.

Standards & quality
EN 1090  ·  ISO 9001  ·  ISO 14001  ·  Eurocode 7  ·  Full steel traceability
Talk to us

The Helicasol team at your service.

Get in touch

Tell us about your project.

Leave your details and we’ll reply within a few working days — straight to your inbox.

Goes straight to info@helicasol.com.

Got a tender on your desk?

Send us the site data and schedule — we’ll respond with preliminary sizing and an indicative price you can carry into your bid.